Tacheng Boiler SST-Direct-Connect Energy Storage Station

Tacheng Boiler SST-Direct-Connect Energy Storage Station
  • Location / Date

    Tacheng, China / 2025.11.10

  • Project Type

    Distribution Network & BESS Field

  • Products

    SST E³Stack-385I

Project Introduction

Delivered on November 10, 2025, the boiler PV-ESS integrated project located in Tacheng Key Development and Opening-up Pilot Zone adopts an SST direct-connected energy storage matrix solution. Equipped with 4 self-developed Solid-State Transformers (SSTs) and 26 units of 385 kWh modular DC energy storage cabinets, the system forms four independent operation units with a maximum operational efficiency of 98.25%.

Supported by coordinated PV-storage control and intelligent cloud platform management, the system delivers multiple benefits including cost reduction via peak-valley arbitrage, heating supply guarantee under harsh conditions and enhanced renewable power absorption, bringing outstanding economic returns. Breaking the technical bottlenecks of high-voltage grid connection for conventional energy storage systems, this solution suits high-altitude regions in Northwest China with extreme low temperatures down to -30°C and can be widely replicated for similar PV-ESS projects.

 

PREV:Nothing
yw-znkf.png